|
|
Raoul Blignaut (Nedcor Bank - South Africa) How does IT evaluation really takes place? - A case study examining the socio-technical riddles of evaluating UNIX capacity alternatives |
|
|
Andy Blowers (Candle Corporation) Giving the Business Units What They Want - End User SLA's |
|
|
Howard Charles (Suncorp-Metway), Mike Le Voi (Hitachi Data Systems)
SAN User Experiences in a Multi-Vendor Environment |
|
|
Sara Cullen (Deloitte Touche Tomatsu) Using a Balanced Scorecard for Outsourcing Success |
|
|
Oscar Ernst (QANTAS) Is Your Organisation Ready for SAN? |
|
|
Shane Ginnane (Ginnane Computer Consultants) SMP/E for Idiots |
|
|
Brian Grindley (Capacity Performance Services, UK) Sizing Development Environments. Programmer Productivity and the Economic Value of Rapid Response Time |
|
|
Bruce Howarth (University of Technology, Sydney) Introduction to Storage Area Networks |
|
|
Ian Jones (Australian Bureau of Statistics) Expanding Your IT Service Vision |
|
|
Clark L Kidd (Landmark Systems) Monitoring HFS Performance with DFSMS 1.5 |
|
|
Kim Ko (IBM GSA) Project Management in Practice |
|
|
Craig Linn
(University of Western Sydney, Nepean) Effective Gathering and Analysis of NT/2000 Performance Data |
|
|
Pierre Louys (State Rail of NSW) IT On the Move... |
|
|
Jacqui Lynch (Circle4 Consultants) Securing against Hackers - UNIX: A Practical Guide |
|
|
Neil McMenemy (McMenemy Consultants Limited) Reducing the Batch Window to Start Euro Processing or Pulling the EMU's Head out of the Sand |
|
|
Neil McMenemy (McMenemy Consultants Limited) Smoke and Remote Mirrors |
|
|
Steve Samson (Candle Corporation, USA) Workload Manager and CICS: New Options and New Insights |
|
|
Andrew Tippett (Storage Technology) Practical SAN's |
Brian Grindley
This paper will demonstrate the techniques used by the author to size development environments and will discuss work to refine the algorithms used.
The cost of getting the sizing effort wrong is usually apparent in cases of overconfiguration, but where sites are underconfigured it is difficult to say what the cost is to the organisation. Brian will discuss how it may be possible to put an economic value on the cost of underconfiguration.
This case study examines the evaluation of UNIX (RS/6000, SUN, HP) infrastructure capacity alternatives within a large financial institution The focus of this paper is to examine what really takes place 'behind the scenes' during the assessment and evaluation of UNIX capacity alternatives. The case will review the technical objectives but will concentrate on understanding the socio-political dynamics which are present in all organisational situations. During the course of the case study it was discovered that there were two, distinguishable and separate evaluations taking place one formal and the other informal. By attending this session you will be better able to identify and understand the dynamics and implications of more than just the technical / capacity aspects of a typical IT evaluation.
Project Management in Practice
Often underrated and misunderstood, Project Management and Project
Management Culture can contribute significantly to an IT organisation in
financial and management terms. In this paper, the author shall discuss the
concepts of project management, what it really means to have a project
management culture, Consultancy Vs Project Management, Deliverable Vs
Delivery, Pitfalls, Value Adds, etc., from a practical viewpoint within the
infrastructure environment.
Performance measurement of commerical outsourcing arrangements has evolved from measuring primarily service delivey to measuring a number of key "partnering" drivers such as service quality, finance, relationship values and value add. The Balanced Scorecard provides the "dashboard" to setting the expectations of both parties and measuring the acheivement of those expectations. It transcends both the contract and service level agreement to combine the high subjective expectations with the monetary and service outcomes.
This session will guide you through the process of developing an outsourcing Balance Scorecard in context of different forms of outsourcing and "partnering" arrangements. It is the new way to select the best service provider and to ensure long term success is achieved.
IT on the Move...
State Rail of NSW is aiming at relocating a number of its business units from various locations in Sydney CBD and consolidating them into three (3) buildings (Central, Xerox house, and CityRail Centre).
As part of the project, the IT division (IT Infrastructure) has been given the task to:
With the advent of e-systems, IT can no longer get away with the
vertical silo views of Application Service. Business Units look at systems as seen by
the end users. Systems Management must achieve the same view. This will allow IT
to manage the e-systems from end-to-end, in a way that matchs the end user
point of view.
Expanding Your IT Service Vision
In many organisations, SAS Institute's ITSV has been used to address the
enterprise's needs for comprehensive warehousing and reporting on IT
infrastructure performance. Following convention, the Australian Bureau
of Statistics (ABS) purchased ITSV primarily to provide reporting on its
complex IT infrastructure including data network and servers.
Fundamentally, ITSV is a transactional-based data warehousing and
reporting system, offering tailored solutions to capacity planners.
Detailed analysis of ITSV architecture will show that administrators are
armed with the ability to provide data warehousing services to
non-conventional clientele including helpdesk management, cost recovery
management and project managers. In this paper, the author reviews the
fundamentals of ITSV, and how the system's flexibility allows
administrators to expand their services. As a member of the ABS Network
Management team, the author provides a case study of his experiences in
expanding ITSV's portfolio to the benefit of the ABS.
Effective Gathering and Analysis of NT/2000 Performance Data
NT 4.0 and its successor, Windows 2000, can provide a vast and rich array
of system wide and application/service specific performance data. In the
first half of this paper we examine: what performance data is available;
where it is obtained from; and the variety of means available to access
it, from low level API programming to very user friendly point and click
GUI displays. In the second half we examine how you can analyse this data
once you have it, and how best to go about integrating the data gathering
and analysis phases. The above is couched within the context of commonly
available tools, some provided with NT/2000 itself as standard, and others
freely available on the Net.
This session covers security concepts for UNIX.
In particular, it goes over some of the legal issues,
covers the tools hackers use, the documents they use and how
to secure your system against them. It also includes
information on what to do when you are broken into. The
intent of the session is not to teach attendees how to be
hackers, but rather to give examples of how systems can be
secured against them. The focus of the second half will be
on UNIX. This material will be presented in two,
back-to-back sessions.
SMP has a long and varied history. Only the developers could honestly describe it as “long and honourable”. There are some of us that remember the days of stage 1 & 2 sysgens; then came SMP4 then SMP/E.
Various packaging solutions have also come, and in some cases gone - IPO, PDO, Custompac and the latest and greatest, ServerPac.
Guaranteed to work - IBM set it up, IPL it, dump it to tape, and ship it to you with a handy little installer.
What could be better:
Monitoring HFS Performance with DFSMS 1.5
Each new release of OS/390 seems to feature more components that rely on
functions provided by UNIX System Services. Thus, the proper tuning of
OS/390 UNIX is becoming a critical and non-trivial component of overall
OS/390 performance. The heart of the OS/390 UNIX file system is the HFS
(Hierarchical File System), and many OS/390 performance problems can be
traced to poor decisions related to HFS data sets. The good news is that
DFSMS 1.5 vastly improved HFS performance, and added some new controls for
tuning these important data sets. The bad news is that most of these new
controls have not been well documented and explained. This session will
attempt to correct that oversight by explaining basic HFS concepts,
exploring the new controls added by DFSMS 1.5, and providing some
practical suggestions for improving HFS performance.
Workload Manager and CICS: New Options and New Insights
Since the announcement of Workload Manager (WLM) in 1994, the interaction
between CICS and WLM goal mode has been a frequent matter for concern. Many
who implement goal mode see the complexity of the CICS interface and the
difficulty of exploiting response time goals; they give up and stay on
velocity goals with no intent to change.
On May 16, 2000, IBM announced a series of new facilities to be available in
the September 2000 time frame to overcome some objections to goal mode. Some
optional changes to the way CICS operates in goal mode are among those new
facilities.
This paper presents the new facilities as they apply to CICS as well as a new
and less disruptive approach to goal mode migration and exploitation for
CICS.
Some have said that batch tuning is a dying trade, there are other, new, exiting technologies that Capacity and Performance analysts should be dealing with. Why then is it still necessary?
Although batch tuning techniques are certainly 'mature' there are now many reasons why the batch window has to be squeezed. Businesses want their on-line systems available earlier in the morning and later at night, continuity of business / disaster recovery backups may be eating into the critical path, business growth may be excessively high or perhaps the batch processing was not well designed in the first place.
This paper documents a case study where a major international corporate bank had to reduce the end-of-year batch window '…by at least four hours' to allow Euro conversion processing to take place over 'le weekend'.
SANs are a hot topic this year. Everyone wants to build one but few people
have achieved one to date. This paper focuses on one user's experiences on
building a SAN over the last 18 months. Suncorp-Metway were a very early
adopter of the technology. They saw the need to rationalise their storage
environment and to achieve economies of scale. Their SAN has been achieved
with a few teething troubles experienced along the way. Nevertheless, the
results have been impressive. They have managed to integrate OS/390, HP-UX
and Windows NT in a multi-vendor, multi-location environment, both for disk
and tape. This paper discusses user experiences, how to avoid the pitfalls
and what to expect when your "SAN Box" is up and running.
Is Your Organisation Ready for SAN?
The implementation of SANs (Storage Area Networks) in medium and large corporations that are running two or more
different platforms presents enormous technical, strategic, organisational, political and cultural issues. It is up to vendors to provide solutions for the technical problems but it is up to the users to find answers for all of the other issues.
Considering that not all companies are the same, Storage Managers evaluating a SAN implementation should expect little
or no help from vendors and/or external consultants when trying to evolve from the traditional "management by platform"
model to the "management by function" model required by SAN.
This paper will try to identify most of these issues and suggest different approaches to tackle the problem.
Introduction to Storage Area Networks
Storage Area Networks (SANs) may be the Next Big Thing. This presentation will identify the business and technological drivers behind SANs and associated products such as Network Attached Storage (NAS), and will attempt to describe the current state of development in the field. Several products are available, and several groups are developing standards for aspects of SAN operation. I will try to show how these are related.
Practical SAN's
Capacity Planning and Performance Management use a wide range of techniques. To the uninitiated some of these methods can appear to be a 'black art' employing 'smoke and mirrors'. This paper shows how a variety of techniques, from simple to complex, helped a site predict accurately the effect that employing a Remote Mirroring technique for Continuity of Business had on its batch window.
![]()
![]()
Sizing Development Environments. Programmer Productivity and the Economic Value of Rapid Response Time.
Capacity Planning Services Ltd.
![]()
How does IT evaluation really takes place?
- A case study examining the socio-technical riddles of evaluating UNIX capacity alternatives
Raoul Blignaut
Nedcor Bank, SOUTH AFRICA
Kim Ko
IBM GSA
![]()
Using a Balanced Scorecard for Outsourcing Success
Sara Cullen
Deloitte Touche Tohmatsu
Pierre Louys
State Rail of NSW
This paper describes the project, planning and the strategies used to undertake this task.
![]()
Giving the Business Units What They Want - End User SLA's
Andy Blowers
Candle Corporation
Ian Jones
Australian Bureau of Statistics
Craig Linn
University of Western Sydney, Nepean
![]()
Securing against Hackers - UNIX: A Practical Guide Part A
Securing against Hackers - UNIX: A Practical Guide Part B
Jacqui Lynch
Circle4 Consultants
![]()
SMP/E for Idiots
Shane Ginnane
Ginnane Computer Consultants
Given the wealth of information available about SMP, lets concentrate on some of the "idiots".
Clark L Kidd
Landmark Systems
Steve Samson
Candle Corporation, USA
![]()
Reducing the Batch Window to Start Euro Processing
or Pulling the EMU's Head out of the Sand
Neil McMenemy
McMenemy Consultants Limited
![]()
SAN User Experiences in a Multi-Vendor Environment
Joint presenters:
Howard Charles, Suncorp-Metway
Mike Le Voi, Hitachi Data Systems
Oscar Ernst
Qantas
Bruce Howarth
University of Technology, Sydney
Andrew Tippett
Storage Technology
The acronym SAN has produced a frenzy of information by both vendors and
analysts. This presentation cuts through this mass of information and uses
real life Australian implementations of SANs in multi-vendor,
heterogeneous environments to give you the facts on what has and can be achieved today,
why you would do it, and the business reasons to move ahead with a SAN
implementation.
![]()
Smoke and Remote Mirrors
Neil McMenemy
McMenemy Consultants Limited